Matthew Nichols Matthew Nichols has more than seven years of experience as a project controls professional and specializes in construction claim analysis, critical path method (CPM) scheduling, and risk management.

Matthew has analyzed entitlement, impacts, and additional costs on owner, contractor, and subcontractor claims for private contractors, private owners, and public agencies in the United States and abroad. Matthew has created, updated, and rebaselined schedules and analyzed schedule constructability, performance, and quality for projects ranging from $1 million to $15 billion.

Matthew has experience on airport, bridge, dam, mass transit, nuclear, oil & gas, water, and wastewater projects in the United States, United Kingdom, and Australia.

Selected Project Experience
  • Analyzed correspondence and performed a contemporaneous schedule analysis, and then developed a request for equitable adjustment and time extension for two 6-MGD water treatment plants.
  • Analyzed the rates of material production and installation equipment, and performed a contemporaneous schedule analysis in response to a subcontractor claim for a 6.5-mile water tunnel.
  • Performed a contemporaneous schedule analysis in response to an electrical subcontractor claim for a 50 MGD water treatment plant.
  • Analyzed standby supervision and equipment in response to a contractor claim for a sewer rehabilitation.
  • Analyzed correspondence and performed a contemporaneous schedule analysis, and then developed a request for equitable adjustment and time extension for a 30-ton-per-day waste-to-energy project.
  • Designed the scheduling architecture for the capital planning system replacement for a natural gas exploration and production company.
  • Created and maintained the schedule for a pipeline booster pump station.
  • Rebaselined and maintained the schedule for a 150 MGD waste water treatment plant.
  • Maintained the Primavera P6 schedule for a nuclear decontamination and decommissioning project.
  • Streamlined the procurement tracking process for an experimental nuclear fusion reactor megaproject in France.
Download Resume

pdf iconchico Download Resume

Qualifications

EDUCATION

Texas A&M University
MEng in Construction Engineering and Management, 2012

Texas A&M University
B.S. in Civil Engineering, 2011

CERTIFICATIONS

Certified Planning and Scheduling Professional (PSP), AACE International

Passed Fundamentals of Engineering (FE) Exam